ABNT ISO TR 10013 PDF

ABNT ISO TR 10013 PDF

ISO/TR (en), Guidelines for quality management system. . Título: Esta Versão Corrigida da ABNT ISO/TR de , incorpora a Errata . Direct link NBR ABNT iso tr free pdf ISO TR – Diretrizes para a documentacao de sistema de gestao da qualidade(1).pdf. ISO/TR. (E). PDF disclaimer This PDF file may contain embedded typefaces. In accordance ABNT ISO/TR um guia para a.

Author: Bazragore Feshicage
Country: Uruguay
Language: English (Spanish)
Genre: History
Published (Last): 9 August 2015
Pages: 444
PDF File Size: 8.28 Mb
ePub File Size: 12.46 Mb
ISBN: 995-8-35456-736-6
Downloads: 21939
Price: Free* [*Free Regsitration Required]
Uploader: Tedal

Applicability QS applies to all internal and external supplier sites of: It is permissible for each surveillance audit to re-examine part of the system so that the equivalent of a total reassessment is completed within each three year cycle.

Production Scheduling – 4. Plan their initial four QS assessments so that no more than three occur during isl consecutive four week period. Refer to the customer documents. Consult your abnnt for further clarification if needed. The supplier should identify and define appropriate metrics to monitor the effectiveness of existing operations.

ISO TR – Documents

The supplier shall implement a system to track and follow-up on these abny if any of this work is subcontracted. Controlled conditions shall include isk following: Shipment Notification System – 4. Suppliers and subcontractors shall deploy QS as appropriate. Team actions should include: Sign In Your Account.

The supplier shall establish the extent and frequency of such checks and shall maintain records as evidence of control see 4. The supplier shall review and approve purchasing documents for adequacy of specified requirements prior to release.

Related Articles  BOB PROCTOR EL ROMPECABEZAS DEL EXITO PDF

To accomplish this, the supplier shall ensure that the Control Plan and Process Flow Diagram see Glossary are implemented, including but not limited to, adherence to the specified: Acknowledgments for this effort are due to: These instructions should be derived from the sources listed in the Advanced Product Quality Planning and Control Plan reference manual.

Be the first to review this item Amazon Best Sellers Rank: Suppliers if applicable shall be knowledgeable of the following standards: If these functions are subcontracted, the supplier shall provide technical leadership. Have experience in accrediting certification bodies to ISOcovering both initial and surveillance visits.

Pertinent quality rr from the subcontractor shall be lso element of these data. Machine setup, die change and machine changeover times? Product Qualification for attributes characteristics using the tables below. The results of the audits shall be recorded see 4. Is the scope of the QS registration appropriate for the product being supplied and does it include the appropriate ISO standard or ? Second party customer assessment – refer to QSA.

Results shall be available for customer review. Safety characteristics are defined as engineering designated specifications or product requirements applicable to component material, assembly operation s which require special manufacturing control to fr compliance with governmental vehicle safety, emissions, noise, or theft prevention requirements.

If in doubt regarding QS applicability, contact your customer. The August, edition of QS can be used until January,at which time it becomes obsolete unless updated with Appendix F and changed pages.

Product audits performed on a regular basis. Reference the customer-specific pages of this document and the Glossary. The Business Plan shall be a controlled document.

Related Articles  HAYAGRIVA KAVACHAM PDF

Prototype – a description of the dimensional measurements and material and performance tests that will occur during Prototype build see APQP reference manual.

ISO TR 20173

The quality plans referred to [see 4. Records of supplier responsible premium freight shall be maintained. Quality performance records e.

Corrective Action Impact – 4. Records of these analyses shall be kept and made available upon request. Characteristics which are enumerated on tf Control Plan and are measured more frequently than once per year will not require annual layout.

Quality System Requirements – AIAG Manual_百度文库

Approved Materials for Ongoing Production – 4. The supplier shall agnt statistical methods of verification where applicable see Section II. This responsibility shall include avoidance of conflict of interest, availability, and timeliness. II 50 Required to switch to Condition I if any sample group has any nonconforming units. Testing requirements not justified by accumulated results?

Accordingly, acknowledgments are due to: Abng to promote continuous improvement are encouraged. These have been well received by the supplier community and their success served to encourage additional efforts.

Release under positive-recall procedures shall not preclude the activities outlined in 4. Approval shall be obtained prior to implementing the change. The laboratory shall verify its capability to perform to the standard specifications before carrying out such work.

Cpk less than 1.